What we manage / Stormwater, Oregon 1200-Z
Your 1200-Z stormwater permit, managed every month.
Oregon's 1200-Z is the industrial stormwater general permit from DEQ. The 2026 permit took effect July 1, 2026 and runs through June 30, 2031. We manage the whole program, so it stops being someone's side job.
What the 2026 permit asks for.
A current SWPCP
Your Stormwater Pollution Control Plan (SWPCP), revised to the 2026 permit and submitted by November 30, 2026. The 2026 format adds a revision log, a site map with a legend and north arrow, and three-digit IDs for discharge and monitoring points.
Sampling and visual monitoring
Samples on the storms that qualify, and visual monitoring on its own schedule, using a clean clear jar and a record of the date, time, location, and findings.
Training and a training log
Training within 30 days of hire or a change in duties, then every year, recorded in a log with dates, names, and job titles kept on site.
Records on request
Documents DEQ asks for are due within 10 business days.
What Starling does.
One flat monthly fee, less than an environmental hire. A licensed engineer reviews every plan and report before it goes out.
Storm tracking
We watch the forecast and tell your crew when a storm may call for sampling.
Sampling and inspections
A calendar and sampling schedule, coordination with your staff or a sampling partner, and a review of every lab report and inspection record.
Your SWPCP kept current
Routine changes go into the plan as they happen, and a licensed engineer reviews every revision.
Training
Crew training with a quiz and the training log done.
Reports and DEQ
Reports prepared and submitted, and routine DEQ contact handled.
Dates to know.
November 30, 2026
Revised SWPCP due from every existing 1200-Z site.
December 31, 2026
Stamped mass reduction certification, only for sites that installed or plan mass reduction measures or need to document a prior waiver. Sites with an approved 2021 certification are exempt.
60 days after a plan revision
Training on what changed, only when the revision responds to one of four kinds of change.
Every five years
No Exposure Certification renewal, for sites that qualify to skip permit coverage.
Related: The 2026 1200-Z training rules, in plain words ยท Stormwater crew training
Sources
- Oregon DEQ, 2026 1200-Z permit
- Oregon DEQ, Summary of Significant Changes, 2026 1200-Z
- Oregon DEQ, industrial stormwater permits
A plain-language summary, not legal advice. Your permit and your plans are what count.
Most sites carry more than one.
We manage one program or all of them, on one calendar with one set of records.
Talk to Starling about your 1200-Z.
Tell us your 1200-Z file number and where your SWPCP stands. You'll get a straight answer on what's due and what's next.
- Call(541) 516-9615