What we manage / SPCC and tanks

Your SPCC plan and tanks, managed every month.

The federal Spill Prevention, Control, and Countermeasure (SPCC) rule covers sites that store oil. We keep the plan current and the inspections, training, and tank records in order.

What the SPCC rule asks for.

A plan, if you store enough oil

The rule applies when a site has more than 1,320 gallons of oil in aboveground containers of 55 gallons or larger, or more than 42,000 gallons buried, and a spill could reasonably reach navigable waters or shorelines.

Certification

Most plans need a Professional Engineer to certify them. Smaller qualified facilities may self-certify.

Training and a yearly briefing

Oil-handling staff are trained, with a discharge prevention briefing at least once a year (40 CFR 112.7(f)).

Reviews and updates

The plan is reviewed every five years and amended when the site changes (40 CFR 112.5).

What Starling does.

One flat monthly fee, less than an environmental hire. A licensed engineer reviews every plan and report before it goes out.

Your plan kept current

Plan preparation and updates as tanks, containment, or operations change.

PE certification

A licensed engineer certifies the plan where the rule requires it, in Oregon and Washington.

Inspections and reviews

An inspection schedule, a review of each checklist, and the five-year review on the calendar.

Tank records

Registration and testing records for aboveground and underground tanks, in one place.

Training

Oil-handler training and the yearly briefing, with the sign-off sheet.

Dates to know.

At least once a year

Discharge prevention briefing for oil-handling staff.

Every five years

Plan review and evaluation.

When the site changes

Plan amendment after a change that affects the potential for a discharge.

Related: Training by permit

Sources

  1. eCFR, 40 CFR Part 112

A plain-language summary, not legal advice. Your permit and your plans are what count.

Most sites carry more than one.

We manage one program or all of them, on one calendar with one set of records.

StormwaterAirHazmat and waste reportingWastewater

Talk to Starling about your SPCC plan.

Tell us roughly how much oil you store and when your plan was last reviewed. You'll get a straight answer on what applies and what's next.

We use this only to reply to you.